Simulations

Planned

Team Model domain and resolution host team contact comments
DOE Energy Exascale Earth System Model Project SCREAM with E3SM Land Model (ELM) 3.25 km global grid with 128 vertical levels up to 40 km NERSC Peter Caldwell, Chris Terai
MPI-M ICON Global, 2.5 km EU Daniel Klocke
NICAM team NICAM global 3.5 km JP Masaki Satoh, Daisuke Takasuka a part of 10-year simulation (2011-2020); additional short-term high-resolution simulation may be provided (1.7km, 870m)
UK HRCM (MO+NCAS) Unified Model global 10km (CP and not) and 5km (CP) UK HRCM P.L. Vidale, Huw Lewis MO is providing regional (tropical channel and multiple regional domains), also run through the DYAMOND protocols
CAS-ESM CAS-ESM2.0 (atmosphere model IAP AGCM5 and land model CoLM) global 10km and/or 5km IAP (China) He Zhang, Kece Fei
ECMWF/AWI IFS-FESOM Global: atmosphere ~2.8km, ocean ~5km EU Thomas Rackow Additional existing (atmosphere-only) simulations (e.g. 4.4km, 9km) may be provided as well